Oil and gas
Changing environmental regulations are increasing pressure on the oil and gas industry to both demonstrate and report on contributions made to positive environmental outcomes. One way to capture these contributions can be achieved through the circular economy during the closure of a site.
Closure of on and offshore oil and gas facilities requires comprehensive closure planning and subsequent decommissioning, decontamination, deconstruction and remediation. Learn more about decommissioning for on and offshore sites for the oil and gas industry.
Clyde Oil Refinery Demolition and Removal
Port Kembla Gas Terminal Demolition and Remediation
Mining and resources
As the availability of mineral resources becomes exhausted in a once abundant site, a mine enters into a new phase – the end of useful life. Our team facilitate the closure of these facilities, which often require comprehensive closure planning and subsequent decommissioning, decontamination, deconstruction and remediation.
We boast decades of experience in some of the most significant mining infrastructure deconstruction projects, including the biggest deconstruction project in the southern hemisphere currently underway in Gove, NT.
Ok Tedi Mine Demolition
Iluka Program of Demolition and Remediation Works
Ellendale Diamond Mine Deconstruction
Energy
One of the greatest challenges facing the power generation sector today is the decommissioning of retired facilities and infrastructure. Having undertaken many high-profile power station closure projects, our team have the knowledge and specialist expertise to undertake the complex process of decommissioning and preparing these sites for reuse.
Munmorah Power Station Demolition and Removal
Remote Demolition of Wind Turbine
Boodarie Hot Briquette Iron Ore Plant Closure
Heavy industrial sites
The undertaking decommissioning and demolition of heavy industrial sites requires specialist expertise complex processes that consider:
- The removal of hazardous materials
- Responsible and ethical waste recycling and disposal
- The deconstruction and disposal of structures
- Safe and responsible remediation of soil, ground and wastewater
Castrol Lubricants Facility Demolition and Remediation
Valspar Paint and Resin Manufacturing Facility Demolition
Moorebank Intermodal Terminal PFAS Containment Pond Construction
Infrastructure
Liberty Industrial has significant experience with large-scale infrastructure projects and is capable of delivering decommissioning, demolition, remediation and site preparation works associated with major transport and logistics infrastructure construction projects.
These projects often require a multi-staged approach, with heavy consideration of extensive and complex demolition, contaminated land remediation and civil construction works.
Northshore Hamilton Wharves Demolition Stages 1 and 2
Sydney Harbour Control Tower Deconstruction
Port Kembla Coal Stacker Reclaimer Demolition Stage 2
Chemical plants
With the principles of end-use in mind, our team have the depth of knowledge and expertise to collaborate with chemical clients to ensure their complex and sensitive facilities are decommissioned, demolished and remediated safely and with full respect for the environment.
Our team completed the successful commissioning of one of Liberty Industrial’s two owned-and-operated high flow rate Chemically Enhanced Dual Media Water Treatment Plants. Capable of treating contaminants such as heavy metals, PFAS, and organic and inorganic pollutants to levels below laboratory reporting limits, the plant added confidence to meet the site’s strict Environmental Protection License.
Valspar Paint and Resin Manufacturing Facility Demolition
Gladstone Air Separation Unit Plant Demolition
Hismelt Kwinana Smelter Deconstruction
Defence and government
Liberty Industrial has significant experience delivering projects for the defence and government sector either directly, or with department officials or third parties. Our team can manage the complex engineering, safety and environmental risks potentially encountered on these sites in combination with complex stakeholder issues associated with archaeological heritage and site and information security.
Our project delivery teams are adept in managing the complex engineering, safety and environmental risks potentially encountered on defence sites such as unexploded ordinance and hazardous substances. They are competent in handling a multitude of complex stakeholder issues associated with such projects like archaeological heritage and site and information security.