Service station pipe covered in mud

Major Service Stations – Five Sites Demolition, Decommissioning and Remedation

Location
Various locations, NSW
Client
ERM
Duration
19 months
Status
Underway

Overview

ERM engaged Liberty Industrial to undertake the demolition, remediation and decommissioning of major service stations across five sites in NSW. The scope of works includes isolation of all site utility services, demolition and disposal of asbestos impacted sites, DG liquid waste removal, washout, destruction and recycling of 5 USTs and their associated infrastructure, excavation of contaminated soil, treatment of hydrocarbon impacted sands and soils complete with site levelling and grading.

Challenges

  • All sites were in fairly remote locations.
  • COVID-19 delays and restrictions.
  • Dust, soil and water management and odour control.

Robust Solutions/Exceptional Outcomes

Robust solutions

  • Our project team has devised a robust methodology to treat hydrocarbon impacted sands and soils from the tank depots through onsite bioremediation and reuse onsite.
  • Odours from hydrocarbon impacted soils were managed using proven and specific hydrocarbon odour mitigation agents with some odorous soils managed by continuous suppression using atomising cannons. This method proved successful with odours non-detectable at boundaries.

 

Exceptional outcomes

Our team is on track to complete the works at the various sites. At present, Liberty Industrial have successfully completed works on one of the service stations.

Value Add

01

Deconstruction

Use of best approach demolition and dismantling such as explosive using world class fleet, safety and engineering methodologies in explosives and rigging.

02

Decontamination and Industrial Cleaning

Designing engineered solutions for decontamination such as removal of asbestos, heavy metals, PCBs, dioxins, PFAS and NORMs.

03

Ground and Waste Water Treatment

Treatment of a wide range of contaminants and complex water treatment and soil vapour extraction.

04

Site Remediation

Site rehabilitation via methods such as bioremediation, containment, decontamination, dewatering, stabilisation, treatment and tracking to disposal of contaminants.

values-bg

Demolition and recycling phase completed for first major closure project for Rio Tinto at Argyle Diamond Mine, WA.

Successful traineeships at Argyle Diamond Mine Closure

The local Traditional Owner business partners helping ensure the safe and successful mine closure at Argyle, WA.

integrated capability responsible decommissioning

decommissioning closure and asset liability consulting

consulting risk management engineered solutions 3d simulation

and simulation liberty modelling dismantling and asset

dismantling and asset recovery synchronised safety

deconstruction resource recovery and recycling expert delivery

high expert industrial delivery reach consulting

expert delivery high reach explosive induced collapse

collapse specialised contracting decontamination

decontamination cleaning remediation environmental stewards

stewards risk mitigation and management waste disposal

How can we help you?

Whether it's a project you would like to discuss, an idea you would like to ponder, or perhaps you're just keen to learn more. We'd love to hear from you!

Get in touch

Search Liberty Industrial