“It’s a testament to the energy, enthusiasm and tireless work that goes into preparation and execution that sets our teams apart. Everyone on our team has a hand in supporting the work leading up to and during these mammoth scrap load outs. We are very proud of what our dedicated people have done and continue to achieve.” Joseph Clarke, Project Director, Gove Demolition and Disposal Project.
Further shipments remain to transport further tonnes of recycled materials The first shipment took place in October 2023, with approximately 15,000 tonnes of scrap steel to be converted into new steel wire, bar and beam products. Around 300,000 tonnes of concrete will also be recycled for l other projects. Liberty Industrial have also invested in a state-of-the-art Concrete Crusher to assist with the concrete recycling program.
In 2024, Liberty Industrial designed, constructed and commissioned two bespoke water treatment plants on site, capable of treating waste waters and recovering valuable resources for other uses, such as dust suppressant and irrigation of rehabilitated areas.